SDMC-Prine Elementary Replacement School

The 116,000 SF Prine Elementary Replacement School project was built simultaneously with Bayshore Elementary Replacement School, both on existing, operating campuses.  To minimize the impact of the construction to the existing facilities, the work was split into two phases on both campuses.  Phase I included building the new buildings on the existing athletic fields while Phase II included the demolition of the existing schools and the construction of new parking lots, bus stops, play fields and a covered play areas.

Responsibilities included Construction Management At-Risk, Preconstruction Cost Analysis, Demolition, Student/Staff Safety, Reporting, and Operational Training and Warranty Monitoring.